
The team is made up of the Anyoji-Beltrando agency, as coordinating architect and for the design of lots D1 and D2, Vincent Lavergne Architecture and Urbanism and Ciguë for lots D3 and D4, RAUM agency for lots D5 and D6 and Altitude 35 (landscapers).
Clarity will be in charge of acoustic studies, construction monitoring and reception measurements.
The operation will be delivered in 2024 for the Olympic Games in Paris.